Construction Progress: Project 0082-0312 Approaches to the Arrigoni Bridge – Middletown / Portland
7-2021 to 9-2021
Stage 3 Desk Pour Stage 3 (South) Deck Reinforcing Installation Stage 3 Waterproof Deck Membrane Installation Stage 3 Sidewalk Posts Installation Stage 3 (South) Barrier Wall Construction Precast Sidewalk Installation Sidewalk Construction Portland Sidewalk Fence Connections Precast Sidewalk Installation Pier 14 Bearing Replacement Pier 13 Bearing Replacement Drainage System Cleaning Rehabilitation Paving and Sidewalk Reconstruction Portland
2-2021 – 7-2021
Stage 3 Sidwalk Fence Posts Stage 3 Deck Demolition Middletown approach widening-curb Stage 2 Deck Demolition Stage 2 Deck Membrane Complete Stage 2 Deck Membrane Stage 2 Rebar Installation Stage 2 Forming and Rebar Stage 2 Paving Stage 2 Forming and Rebar Stage 3 Deck Demo Stage 3 Deck Removal Stage 3 Deck Forming Stage 3 Deck Forming Stage 3 Barrier Forming Stage 3 Deteriorated Rivet Replacement Stage 3 Cable Seperators Stage 3 Deck Pouring Stage 3 Rebar Stage 3 Main Span Post
Extensions for Anti-climb FenceStage 3 Sidewalk-Strut Removal Stage 3 Sidewalk Removal Stage 3 Sidewalk Installation
1-13-2021
Substructure Repair Concrete Pier 1-4 Stage 2 Traffic Pattern West Approach (Middletown) Stage 2 Traffic Pattern East Approach (Portland) Stage 2 Temporary Structure Barrier Installation and Anti-Glare Screen Saw cutting Bridge Deck West (Middletown) Approach Saw cutting Bridge Deck East (Portland) Approach Mill Asphalt From Bridge Deck Stage 2 Construction Area Installation of Pedestrian Handrail and Climb Resistant Fence
12-7-2020
Portland Lower Main Street Widening Portland Lower Main Street Widening Preparing for Stage 2 Installation of Suspension Cables Separators East Approach Barrier Transition Completed Railing Installation, Rail Post Extensions Anti-Climb Fence Installation
10-7-2020
West Approach Span 9 setting Sidewalk Panel West Approach Bridge Deck Concrete Pour East Approach Barrier Wall Sidewalk and Fence East Approach Pavement and Barrier Wall East Approach Membrane Top Coat and Aggregate East Approach Membrane Base Coat East Approach Screed Dry-run
7-21-2020
West Approach deck forming and shear stud installation West Approach deck forming and electrical conduit replacement West Approach Deck forming and debris shielding West Approach Deck forming – shear stud installation Sidewalk Tie Plate Replacement
6-15-2020
Rivet Replacement and Bridge deck forming Removal of Sidewalk slabs East Approach Removal of Sidewalk Slabs East Approach Removal of Deck Slabs West Approach Removal of Bridge Deck West Approach 2 Removal of Bridge Deck Slabs East Approach Bridge Deck Forming Bridge Deck Forming and Steel Cleaning Begin Installation of Bridge Deck Reinforcing
Construction Progress: Project 0082-0320 ST. Johns Square / Main Street Improvements – Middletown
12/7/2020
Stamped Asphalt Island and Crosswalk Roadway Reconstruction, Stamped Concrete Island, Timber Utility Poles, Line Striping at Hartford Ave Milling Paving, Stamped Asphalt Island, and Line Striping at Main St. John Square Milling Paving, Stamped Asphalt Crosswalks and Line Striping at Rapallo and Grant Street Milling Paving and Line Striping at Washington Ave Continue Installation of Signalization
10/7/2020
NW Corner of Grand St. Stamped Concrete-and-new-bump-out SE Corner of Rapallo Ave New Bumpout and sidewalk SE Corner of Rapallo Ave SE Corner of Washington St 1 SE Corner of Washington St
7-21-2020
Electrical Conduit Installation. Traffic Control Box foundation Installation Pedestrian Crossing Pedestal Foundation
6-15-2020
Anchor Bolts and Formwork Mast Arm Foundation Spring Street Sidewalk Spring St Sidewalk and Curbing Rebar installation for Mast Arm Foundation Foundation for Retaining wall Hartford Ave and Main St Excavation for Mast Arm Foundation Electrical Conduits and Concrete Placement Mast Arm Foundation